Tuesday, September 3, 2013

Construction Happens, and Happens Some More


After all the wishing and planning and designing and ordering and purchasing was complete, the contractor and his maestros (workmen) moved in and things started happening rather precipitously.  In the past three weeks, we have had:  


1) The demolition of pretty much the whole apartment down to the concrete structural walls.  Floors, ceilings, doors, lintels, non structural walls - you name it, we dug it out.
2) Lots and lots of jackhammers. Tiles don't give up easily.
3) One very seasick apprentice who'd been manning a jackhammer in a small concrete space for two and a half days straight.
4) Electricians.  Everywhere. 
5) Ditto plumbers.
6) The original in-floor heating layer was poured funny, and there’s a seven cm slope differential in the living room floor that needs fixing.  Uh oh.
7) Concrete dust, everywhere.
8) Does anyone else smell that smell
9) An unexpected trip to the ER with probable ripped tendons all over my foot, and a very unexpected diagnosis of plantar fascitis.
10) Crutches.
11) Physiotherapy.
12) More Plumbers.
13) That smell can't possibly be real, right?
14) It's coming from the bedroom end of the flat?  Oh God, now we have to take up the bedroom floors, too.  You mean all of them?!?!
15) Rush shopping for new bedroom floors - on crutches.  And there's an eight centimeter differential that needs fixing in the master bedroom as well? How jolly.
16) More concrete dust.  Everywhere else.
17) Ceramicists laying tiles.
18) A seriously unhappy resident who calls the police because the ceramicists decided to use the spare key to come in on the weekend and make Very Loud Bashing Noises waaaaay outside of allowable-noise-hours, and going in person to yell at the ceramicists apparently didn't work.
19) Damage control. Much abasing. With chocolates.
20) Food poisoning. All Saturday night and all Sunday.  Did you know you can move really fast on crutches?
21) Ceramicists who, sulking about being bawled out by their general contractor, turn off their phones and refuse to come in to work on Monday. Tuesday they aren’t feeling quite up to par, so they don’t come in that day either. Burp.

Today the electrician is wiring up the bedrooms, and the ceramicists are back on the job, moving steadily through the kitchen and down the hallway. They do lovely work, but the noise really is incredible. I think the neighbor showed considerable restraint. If I'd heard them doing that above my head at 4:30 on a Saturday afternoon, I'd have skipped the local cops and called in a S.W.A.T. team. With helicopters.




No comments:

Post a Comment